Check back soon to view and download many technical specification sections specific to landfill construction contracts. Peak GeoSolutions believes that standardization of contract documents is paramount to the success of the industry, and therefore believes that providing and sharing our expertise in the preparation of technically sound documents. Our technical specifications and front-end documents are of the highest standards, have withstood the test of time while still implementing the most recent and recognized methods of engineering and construction technology. PeakGeo’s chief technical writer is certified by the Construction Specification Institute (CSI) as a Certified Contract Technologist and utilizes practices and formatting established by the Engineers’ Joint Contract Documents Committee (EJCDC) and CSI in preparation of contract documents, and also prepares contract documents in state and municipal formats as necessary. Typical broad, medium and narrow scope specification sections from Division 1 and Division 2 will include:
DIVISION 1 |
DIVISION 2 |
Summary of Work |
Temporary Erosion and Sediment Control |
Measurement and Payment |
Expose Existing Terminations |
Modification Procedures |
Excavation and Embankment |
Coordination of Work |
Subgrade Preparation |
Surveying |
Low Permeability Soil Layer |
References |
Trenching and Backfilling |
Project Meetings |
Granular Drainage Materials |
Submittals |
High Density Polyethylene Pipe |
Construction Schedule |
Geomembrane |
Quality Control |
Geotextile |
Construction Facilities |
Geosynthetic Clay Liner (GCL) |
Temporary Controls |
Geocomposite |
Contract Closeout |
Geoelectrical Liner Surveys |
PeakGeo is highly experienced in the development of CQA programs and manuals. In short, CQA services include product verification testing, construction monitoring, construction verification testing, and project documentation. Our CQA programs are of the highest standards and are on the leading edge of the construction industry, implementing the most recent and recognized methods of engineering technologies. In 1996, PeakGeo introduced an innovative CQA program that paralleled the technical specifications of the contract documents. The response was overwhelmingly positive to the format, organization, correctness, and thoroughness of the program. This CQA program received recognition from the State of Oregon’s Department of Environmental Quality as an organized and comprehensive program. Check back soon to view and download a CQA Manual as related to a typical solid waste containment project.
Contact Us
Please feel free to contact us by your preferred method. We can be
reached via the telephone at 877-721-4196. Our administrative email address is
as follows: admin@peakgeo.com. If you would like to contact a member of our staff
directly, please proceed to our personnel directory.